Why Cold Heading Costs Less
Why cold heading beats CNC on cost: 90% vs 40–60% material use, 60–200 parts/min vs a few, no chip disposal — scale is the precondition.
Cost structure
- Material is 50–70% of unit cost — heading saves it directly
- Tooling amortises over volume: below ~50 k pcs it does not pay
- CNC suits prototypes and complex shapes
Standards basis
Basis: "Multi-Station Cold Heading" and "Tooling for Automated Cold-Heading Production" — utilisation and cycle data from the monographs plus our in-house figures.
FAQ
What is the MOQ for Why Cold Heading Costs Less?
Stock items ship in small batches; custom parts are quoted per tooling and process — the quotation is authoritative.
What is the lead time for Why Cold Heading Costs Less?
Samples in 1 day for stock, volume 7–15 days; new tooling samples in 3–7 days.
Can why cold heading costs less be made to drawing?
Yes — process review within 48 h, samples in 3–7 days, full first-article inspection before volume.
Are inspection reports available?
Dimensional reports ship per batch; salt-spray, pull-out and mechanical data is published and quotable on the test-data pages.
Need a spec check or 1-day sample?
Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).
Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))