Cold Heading
Cold heading: room-temperature die forming keeps continuous grain flow and 90%+ material use — best above ~50 k pieces/year.
Heading sequence
- Cut → pre-form → final head form → thread rolling → heat/surface treatment
- 4–6 station headers run 60–200 parts/min
FAQ
Can cold heading make specials?
Bosses, flanges, steps and non-round heads are fine; limits in the shape-limits article.
Need a spec check or 1-day sample?
Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).
Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))





