Skip to content

Cold forging design

Cold-heading feasibility: enter head and shank ratios and features; verdict — head it or machine it.

Cold forging design

Results update as you type.

Judgement basis

  • Headable when head OD ≤4× shank and head height ≥0.4×
  • Non-round heads and off-axis bosses need more stations
  • Slenderness >20 → turning

FAQ

What is the MOQ for Cold forging design?
Stock items ship in small batches; custom parts are quoted per tooling and process — the quotation is authoritative.
What is the lead time for Cold forging design?
Samples in 1 day for stock, volume 7–15 days; new tooling samples in 3–7 days.
Can cold forging design be made to drawing?
Yes — process review within 48 h, samples in 3–7 days, full first-article inspection before volume.
Are inspection reports available?
Dimensional reports ship per batch; salt-spray, pull-out and mechanical data is published and quotable on the test-data pages.

Need a spec check or 1-day sample?

Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).

Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))