Skip to content

Electronics fasteners

Industrial-electronics fasteners: outdoor cabinet sealing, control-cabinet sheet, rail and heatsink mounting — anti-loosening, anti-corrosion and waterproofing.

Electronics fasteners

Three protections

  • Water → IP66 bonded-seal assemblies
  • Corrosion → zinc-nickel, 720 h salt spray
  • Loosening → pre-applied adhesive for transport vibration

PCB application

Tin-plated copper nuts and mini plates solder onto PCBs for threads with standoff, both tape-and-reel; high-current terminals conduct and thread reliably, with pre-coatable internal/external threads.

Riveting products

Clinch nuts/studs, rivet nuts and blind rivets fasten equipment cabinets; clinch earth terminals handle earthing; sealed studs and pre-coated riveted parts reach IP68 for waterproof cabinets.

Inserts, locking and sealing

Inserts strengthen lightweight structures to grade 8.8+ in carbon and stainless steel; bolts lock via combinations and pre-applied threadlocker; head/thread pre-coat plus sealing rings reach IP68; captive screws stay attached after removal.

Specs, MOQ and lead time

Size range
Precision fasteners: micro screws M0.6–M3, insert screws M1.4–M8, threaded inserts M2–M12 / 10-24 to 1/2-13, bolts, nuts and washers M2–M16
Stock items
Retained-stock SKUs ship from stock; see the stock page for the current list
MOQ
Small quantities for stock items; custom parts quoted per tooling and process
Tiered pricing
Three tiers: sampling / small batch / volume production
Lead time
Samples in 1 day for stock; volume 7–15 days; new tooling samples in 3–7 days
Packing & OQC
Packed to customer spec; shipment with inspection report (dimension / visual / salt spray / pull-out as required)

FAQ

Which coating for outdoor cabinets?
Zinc-nickel (720 h) or Dacromet; coastal sites add a sealer.
Which screws for heatsinks?
Plastic-head insulated screws, or steel screws with isolating washers.

Need a spec check or 1-day sample?

Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).

Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))