Skip to content

Bolt Preload Calculation

Preload: F = 0.7·σs·As (60–75% of yield) — enter size and grade for recommended preload and matching torque.

Bolt Preload Calculation

Results update as you type.

Quick table (grade 8.8)

SizePreload (kN)
M5≈7
M6≈10
M8≈19
M10≈30
M12≈44
Source: 60% of yield per GB/T 3098.1

FAQ

What is the MOQ for Bolt Preload Calculation?
Stock items ship in small batches; custom parts are quoted per tooling and process — the quotation is authoritative.
What is the lead time for Bolt Preload Calculation?
Samples in 1 day for stock, volume 7–15 days; new tooling samples in 3–7 days.
Can bolt preload calculation be made to drawing?
Yes — process review within 48 h, samples in 3–7 days, full first-article inspection before volume.
Are inspection reports available?
Dimensional reports ship per batch; salt-spray, pull-out and mechanical data is published and quotable on the test-data pages.

Need a spec check or 1-day sample?

Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).

Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))