Manufacturing Capabilities
Capability base: multi-station cold heading (M0.6–M16), CNC turn-mill, thread rolling, heat treatment and finishing across twin plants — Pingshan for precision micro parts, Gucheng for volume heading and finishing; 123 cold headers and 23 CNC/swiss machines support sampling through volume.
Capability matrix
| Process | Capability | Plant |
|---|---|---|
| Cold heading | M0.6–M16, 4–6 stations | Pingshan / Gucheng |
| Thread rolling | M0.6–M12, class 6g | Pingshan |
| CNC turn-mill | IT7, runout ≤0.01 mm | Pingshan |
| Heat treatment | QT / case / stress relief | Gucheng |
| Surface finishing | Zinc / Zn-Ni / Dacromet / PVD | Gucheng |
Six technical services across the launch chain
- Design consulting: concept-to-product support, fastener database, 2D/3D and simulation (DFM) — design efficiency +30%
- Sample making: stock full-substitution first → functional substitution → CNC-machined samples, as fast as 1 day
- Test & verification: 12 in-house equipment classes, results in 1–2 days (salt spray/weathering excepted); reports carry measured data for PPAP
- Teardown benchmarking: joint teardown, drive unification, multi-function consolidation — total cost −10% or more
- Volume optimisation: CNC→cold heading (with simulation), parameter tuning, parts consolidation — about −20% cost for CNC→heading
- Training: process flow, quality planning, selection basics and advanced — design efficiency +20%, quality cost −15%
Engage engineering early: the 15-85 rule
Purchase price is typically only 15% of a fastener’s lifecycle cost; the other 85% hides behind the drawing. Technical services work inside that 85% — the earlier we engage, the more freedom to adjust and the larger the savings.
Cost-down cases
- 6061 battery-pack lifting sleeve: CNC turning → multi-station cold heading — unit cost ¥50→¥20 (−60%), output 60→300+ pieces/day; continuous grain flow with better stress-fracture resistance than machined parts
- VA/VE parameter optimisation: die cost ¥78,000, 500k total volume — ¥0.75/unit saved, ¥375,000 in total
- Unit cycle time cut without new equipment or die investment
Service flow: five steps from drawing to launch
- Intake: describe the duty condition in one sentence, or upload a drawing / competitor part
- Feasibility: route, schedule and cost basis clarified in one pass
- Sampling & test: stock substitution first, then CNC samples; tests on in-house equipment
- Report & advice: measured data plus actionable optimisation recommendations
- Launch support: process consolidation and documentation for PPAP / SPC audits
Three contact tiers
Phones and mailbox are identical site-wide and match the structured data.
| Need | Contact | Reach |
|---|---|---|
| Technical · Engineering review | Mr. Zhang (Engineering & Sales Director) | +86 135-1036-9429 [email protected] |
| Sales · Quotes / MOQ / lead time | Ms. Fan (Sales Manager) | +86 135-6073-0094 [email protected] |
| Complaints & suggestions | Complaints & suggestions (reply within 24 h) | [email protected] |
FAQ
Must services tie to purchase orders?
Fastest sample lead time?
How are test reports regarded?
How is confidentiality handled?
Need a spec check or 1-day sample?
Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).
Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))





