Fastener Quality System
Quality systems and certifications: ISO 9001 / ISO 14001 / IATF 16949 / ISO 45001 and CMMM Level 3 — all five certificate originals published with verifiable numbers and validity (details on each sub-page).
Certificate master table (as on the originals)
| Certification | Certificate No. | Body | Validity |
|---|---|---|---|
| ISO 9001:2015 | 44858 | NQA (UKAS 0015) | until 2027-05-28 |
| ISO 14001:2015 | 44859 | NQA (UKAS 0015) | until 2027-05-28 |
| IATF 16949:2016 | T12013 / IATF 0518802 | NQA | 2024-05-23 to 2027-05-22 |
| ISO 45001:2018 / GB/T 45001-2020 | SW25S20354R1M | Sailway Certification (CNAS C201-M) | until 2028-05-25 |
| CMMM Level 3 | BIFNC-0755-3482-2024-0281 | assessed to GB/T 39116/39117-2020 | until 2027-12-03 |
| Source: Certificate scans are published on each sub-page; ISO 9001/14001 details verifiable at CNCA (www.cnca.gov.cn) and SNOA (www.snoa.com.cn). | |||
What this means for purchasing
- Automotive parts: IATF 16949 covers fastener production — PPAP-grade FAI, control plans and MSA delivered to automotive practice.
- Export parts: ISO 9001/14001 are UKAS-accredited (NQA) — internationally recognised under the IAF MLA.
- On-site audits: welcome — lines, labs and traceability demos can be arranged; verify certificate originals on the sub-pages first.
FAQ
What is the MOQ for Fastener Quality System?
Stock items ship in small batches; custom parts are quoted per tooling and process — the quotation is authoritative.
What is the lead time for Fastener Quality System?
Samples in 1 day for stock, volume 7–15 days; new tooling samples in 3–7 days.
Can fastener quality system be made to drawing?
Yes — process review within 48 h, samples in 3–7 days, full first-article inspection before volume.
Are inspection reports available?
Dimensional reports ship per batch; salt-spray, pull-out and mechanical data is published and quotable on the test-data pages.
Need a spec check or 1-day sample?
Send us your drawing, spec or part code. We reply the same day on stock, MOQ, tiered pricing and lead time (1-day sampling for stock; volume 7–15 days).
Call directly: +86 135-1036-9429(Mr. Zhang (Engineering & Sales Director)) · +86 135-6073-0094(Ms. Fan (Sales Manager))






